• Captured on our Aerial Photography Platform on Mt Louisa, Townsville

    A Unique View

TEi – Mt Louisa Reservoir Project

Posted · Add Comment

August 2014 – September 2015

Townsville Engineering industries approached us to provide frequent Photography and Videography updates of the Mt Louisa Water Tank Project. The purpose was two fold, to showcase the fantastic work that TEi has been conducting on Mt Louisa as well as to provide project updates to Townsville Water and Townsville City Council. This project is located within 3nm of Townsville airfield requiring a communication with Air Traffic Control and integrating with VFR air traffic with us only requiring to land when IFR coming down the ILS (Instrument Landing System) on the main run way or air traffic flying over the top of Mt Louisa to land on the main runway.

The video below is the final video that shows the progress of the project as capture by NQ UAV.

The Mount Louisa Reservoir Stage 3 is a Townsville City Council: Townsville Water Funded Project.